MEGA PROJECTS

Hilite Marina, Mampuzha River Front, NH-17 Bypass.



Project Profile.

  • Total built up space 9.58 Lac sq. ft.
  • Total saleable area 7.00 Lac sq. ft.
  • Shopping Space: 19000 sq. ft. of shopping area with access from NH By Pass.
  • Total land area 450.15 Cents.
  • Total floors Basement + G F + 19 floors.
  • No. of Towers 3 (1+1).
  • Total Apartments 410 Nos.
  • Total Car Park 600 plus.
  • Frontage to By Pass Road 76 mtrs.
  • Distance from Thondayad ByPass Junction: 4.50 KMs.
  • Distance from Arayadathupalam Junction: 7 KMs.
  • Distance from Hilite Hills 1 . 5 0 KMs.

NATIONAL GAMES & STADIUM'S

Indoor Stadium, Chevayur.



MEGA PROJECTS

Land Mark Acropolis, NH-17 Bypass


MEGA PROJECTS

Hilite Spring Dale, Palazhy, Off NH-17 Bypass.

Features

State-of-the-art luxury villas, thoughtfully designed and futuristically crafted. Spring Dale has in offer, all world class amenities befitting modern lifestyle. Set a sprawling location in Palazhi, calicut. Spring Dale is a part of the Logosity Township Project which includes the reputed Sadhbhavana World School.

With it’s grand clubhouse, swimming poll, well-equipped fitness center and others as part of the amenities, what Spring Dale offers you is the convenience and luxury of a gated community living .A contemporary living space of your dreams without hassles of security, still located in proximity to a host of multi-speciality hospitals, school, world-class shopping enters and restaurants. Surrounded by greenery, and an elite neighborhood. In that way, ensuring all the advantages of modern community living.

IT Parks

Cyber Park, Final Render.

Birds eye view

Finally Malabar is going to get its share of space in the IT map of kerala, the cyber parks being developed by Kerala IT Mission and ULCCS is going to bring revolution in the industrial development of the sleeping tiger Kozhikode and in general Malabar through the hub of Kozhikode and spokes coming up at Kannur and Kazaragode. Kozhikode does have a lot of advantages for IT development and the most important of it is, its statergic location, all major industrial centers are very near to calicut and very well connected by air, roads, and railways, another one would be the presence of premiere educational institutions like IIM, NIT, etc. The availability of very high level local talent pool also add up on it.
The Cyber Park on completion would directly provide job opportunities for 1500 personnel and to more than 6000 people indirectly. The maiden tower is expected to be completed by 2011. And it would become fully operational by 2025. The development cost of the Cyber Park is pegged at 550 crores. The availability of cheap labour, the presence of trained human resources, access to road-rail connectivity and an international airport will turn Cyber Park into a cynosure of all eyes. The infrastructure development will begin shortly. The facilities like establishing a 110 KV power station, construction of approach roads, sewage plant, rain harvest-water supply system etc will also follow suit. The first tower will come up in 4 lac sq ft area. Of this, 1.5 lacs will get completed in 2011. With that job opportunities for 1500 people will be created directly and for another 6000 indirectly. The first phase of construction will commence in July. A total of 40 lac sq ft area will be completed within 5 years. The same area is expected to be built at U L Cyber Park. The first tower will accommodate Software Development Block, Incubation Centre, Training Centres etc. The total project cost is estimated at 95 crores. An annex in 30000 sq ft will also be built to facilitate small and medium scale companies. The construction will be completed by October 2011.
The satellite centres at Kannur and Kasargode will also have a constructed area measuring 1.5 lacs Sq Ft and will be completed by 2011. Those centres will also have Software Development Block, Incubation Centre and Training Centres. The total project is estimated at 57 Crs. The internationally acclaimed Canon Design International is designing the Cyber Park. A Cyber Park of this kind could have been streamlined in Malabar region at least two decades back.


Blooming Calicut Projects

EDUCATIONAL INSTITUTIONS

Hospitality Management Institute
(on the premises of the old Kerala Soaps and Oils Ltd)






  • Land area: 5 acres
  • Built-up area: 1,40,000 sq ft
  • Floors: 5
  • Cost: 40 crores
  • Architect: Chandramohan Associates